Evidence & Verification

Evidence & Verification

Every impact claim should be traceable

Explore official project records, monitoring reports, methodology explanations and field photographs for the HECTOR programme.

Explore the evidence

Project records, methods & field documentation

Start with the official project records, then explore report-specific calculation assumptions and field photographs.

Methodology & Baseline

Read the fNRB and MoFuSS explanation, historical VPA baselines and the calculation framework documented in the monitoring reports.

Explore methodology & baseline

Monitoring & Field Evidence

Explore photographs of equipment installations and water collection, with an explanation of how field images differ from monitoring results and certification records.

Explore monitoring & field evidence

Official project records

Project Registry & Certification Documents

Explore the Gold Standard records and supporting documents for each HECTOR project activity. Use the official sources below to check the latest project status, available reports and credit records.

HECTOR · INDIA

VPA1 / GS13130

Voluntary Project Activity 1 under the HECTOR programme. View its official registry entry and documents hosted by Gold Standard.

View VPA1 registry (new tab)

VPA1 certification documents (new tab)

Browse available design, validation, monitoring and verification reports, with upload dates on the official document page.

HECTOR · INDIA

VPA2 / GS23337

Voluntary Project Activity 2 under the HECTOR programme. View its official registry entry and documents hosted by Gold Standard.

View VPA2 registry (new tab)

VPA2 certification documents (new tab)

Browse available design, validation, monitoring and verification reports, with upload dates on the official document page.

View the latest project records on the Gold Standard Registry. These links open the official sources; this page is not an automatically synchronised data feed. Document availability and certification status may differ by project.

Browse all Expert365 registry projects (new tab)

Document library

Certification documents by VPA & monitoring period

Browse the available project documents by activity and reporting period. Expand a group to see document names and upload dates, then open the official Gold Standard page to download the files.

Source register checked: . This is a dated document index, not a live feed.

VPA1 / GS13130 — Monitoring period 2 (4 documents)

Period: 1 February 2025 – 28 October 2025

Gold Standard document group: Performance Certification | Real or Regular VPAs no. 1

  • Monitoring report

    Required (GS13130-Monitoring-Report.pdf)

    Uploaded:

  • Ex-post emission reduction calculations

    Required (GS12792_1FEB2025-28OCT2025-ExPost ER_VPA1_2ndIssuance.xlsx)

    Uploaded:

  • Verification report

    Required (GS13130_MP2_VER_Report_17062026_clean_SgACM.pdf)

    Uploaded:

  • Supporting project document

    Supporting (G12792_VPA1-DD_V08_Final dMRV clean.pdf)

    Uploaded:

Open VPA1 official document list (new tab)

VPA1 / GS13130 — Monitoring period 1 (5 documents)

Period: 17 May 2024 – 31 January 2025

Gold Standard document group: Combined Design and Performance Certification | PoA with Real Case VPA no. 1

  • CCIPL assessment report

    Required (CCIPL 2596_FVR _MR- 15122025_Clean.pdf)

    Uploaded:

  • Ex-post emission reduction calculations

    Required (HECTOR_17MAY2024-31JAN2025-ExPost ER-151225.xlsx)

    Uploaded:

  • Monitoring report

    Required (T-PerfCert_V1.1-Monitoring-Report-Clean.pdf)

    Uploaded:

  • VPA design document

    Required (T-PreReview_v2.3-VPA-Design-Document_Clean-271125.pdf)

    Uploaded:

  • CCIPL assessment report

    Required (CCIPL 2596 FVR 02122025_VPA 1_Clean.pdf)

    Uploaded:

Open VPA1 official document list (new tab)

VPA1 / GS13130 — Issuance no. 1 – supporting documents (2 documents)

Period: Related to monitoring period 1

Gold Standard document group: Issuance no. 1

  • CCIPL assessment report

    Supporting (CCIPL+2596_FVR+_MR-+05112025_CC ISSR.pdf)

    Uploaded:

  • Monitoring report

    Required (T-PerfCert_V1.1-Monitoring-Report-Clean-241025 ISSR.pdf)

    Uploaded:

Open VPA1 official document list (new tab)

VPA2 / GS23337 — Monitoring period 1 (6 documents)

Period: 2 June 2025 – 31 December 2025

Gold Standard document group: Combined Design and Performance Certification | Real Case or Regular VPA no. 1

  • Ex-ante emission reduction calculations

    Required (ER-Ex-ante.xlsx)

    Uploaded:

  • Monitoring report

    Required (GS23337_Monitoring-Report.pdf)

    Uploaded:

  • Validation report

    Required (GS23337_Validation_report_V01_Clean_SgACM.pdf)

    Uploaded:

  • Ex-post emission reduction calculations

    Other (GS23337_Ex-post_1Jun2025-31DEC2025.xlsx)

    Uploaded:

  • VPA design document

    Required (GS23337_ Regular_VPA DD_V04.pdf)

    Uploaded:

  • Verification report

    Required (GS23337_MP1_VER_Report_Clean_SgACM.pdf)

    Uploaded:

Open VPA2 official document list (new tab)

VPA2 / GS23337 — Preliminary review (1 document)

Period: Project-level review; no monitoring period assigned

Gold Standard document group: Preliminary Review no. 1

  • Preliminary review submission

    Required (GS 23337_v4.0-Preliminary-Review-Submission latest version_GSDecision.pdf)

    Uploaded:

Open VPA2 official document list (new tab)

OFFICIAL CONSULTATION WINDOWS

Stakeholder consultation dates

The Gold Standard Assurance Platform lists the following stakeholder consultation windows alongside the project document groups.

Source: Gold Standard Assurance Platform project document pages, checked . These are the displayed consultation windows; the dates alone do not establish meeting attendance, consultation outcomes or certification approval.

Registry transaction records

Issuance & Retirement History

Snapshot checked on 6 October 2026. These are dated Gold Standard Registry records, not an automatically synchronised feed. Open the official registry for subsequent changes.

VPA1 — GS13130

Registry status: Gold Standard Certified Project

29,427VER credits issued
10,000VER credits retired
Issued credits by vintage year
Vintage VER credits Issuance date
2025 3,508 18 December 2025
2024 25,919 18 December 2025
Total 29,427 Two issuance records

Vintage identifies the credit year, not the issuance date.

Retirement records

Green Trip Q3 2026

5,000 VER credits
Retired: 6 October 2026
Vintage: 2024

Note: Retired under the name of Perk SL – for the purpose of Green Trip Q3 2026

Credit serial number

GS1-1-IN-GS13130-16-2024-29892-5519-10518

Green Trip Q2 2026

5,000 VER credits
Retired: 1 September 2026
Vintage: 2024

Note: Retired under the name of Perk SL – for the purpose of Green Trip Q2 2026

Credit serial number

GS1-1-IN-GS13130-16-2024-29892-519-5518

View VPA1 issuance and retirement records in the registry (new tab)

VPA2 — GS23337

Registry status: Listed

No issuance or retirement records listed as of 6 October 2026. This describes the listed transactions, not the project’s operational activity or measured emission reductions.

View VPA2 registry records (new tab)

Original Equipment Manufacturer (OEM) and Assembler

RealTech System

Factory

9, Erode Road Cross Street -1,
Vengamedu,
Perundurai-638052
Tamil Nadu
India

Address

Suite 2803N
889 Collins St.
Docklands, 3008
Victoria, Australia

  • Quick Contacts

    If you have any questions or need help

    +918008529761

    9, Erode Road Cross Street -1, Vengamedu,

    Get Direction